PROJECT DEVELOPMENT

Four steps to get a Turbulent plant going.

Turbulent hydropower plants can be installed all over the world in connection with local distributors, who have the knowledge of their region’s water rights and permits to contribute to the project. Working with official local distributors helps end users keep their costs down, but in certain instances we can offer services to augment.

Along with the production of the turbine, Turbulent can optionally assist you for each step. Get in touch with us in order to get a precise quotation for your needs.

PRE-STUDY

TECHNICAL DESIGN AND PREPARATION

TURBINE PRODUCTION AND INSTALLATION

MAINTENANCE

Pre-Study

1

1

  • Primary assessment/site evaluation

  • Estimation proposal and purchase agreement for detailed engineering

 

  • Go or No-Go on financial and technical viability

Technical Design & Preparation

2

2

  • Detail of the implementation planning
     

  • Technical preparation and production documents
     

  • Reduce investment costs

Turbine Production & Installation

3

3

  • Construction of the turbine with concrete and high quality materials
     

  • Installation and external revision of the hydraulic system and the electrical connections to the grid
     

  • Operational gain guarantee/high performance
     

  • This stage can be completed within six months

Maintenance

4

4

  • Corrective maintenance and system updates
     

  • Remote monitoring system 24/7, keeping the performance of the system high
     

  • Guarantee of energy availability and system efficiency

Prestudy
Preparation
Installation
Maintenance
1
2
3
4

PRE-STUDY

TECHNICAL DESIGN AND PREPARATION

TURBINE PRODUCTION AND INSTALLATION

MAINTENANCE

  • Primary assessment/site evaluation

  • Estimation proposal and purchase agreement for detailed engineering

 

  • Go or No-Go on financial and technical viability

  • Detail of the implementation planning
     

  • Technical preparation and production documents
     

  • Reduce investment costs

  • Construction of the turbine with concrete and high quality materials
     

  • Installation and external revision of the hydraulic system and the electrical connections to the grid
     

  • Operational gain guarantee/high performance
     

  • This stage can be completed within six months

  • Corrective maintenance and system updates
     

  • Remote monitoring system 24/7, keeping the performance of the system high
     

  • Guarantee of energy availability and system efficiency

Minimal maintenance.

We estimate the lifetime of an entire system to be 30 years provided the maintenance plan is followed. Our maintenance plan is simple.